Legacy Investing Core42 Data Center

A 18,000 SF data center construction for Legacy Investing in Minneapolis, MN

Fast Facts

  • 18,000 SF
  • Client: Legacy 1001 Minneapolis Venture
  • Architect/Design Team: Syska Hennessey Group, Inc.

Features

  • Generator roof placement
  • Multi-phase project
A tall crane hoists rooftop mechanical equipment above a mid-rise building amid the downtown Minneapolis skyline.

Project Goal

Turning underutilized office space into a mission-critical facilitiy

Phases 1 and 2 of the Legacy Investing Core42 project transformed the former Sleep Number Headquarters in Minneapolis into a 24MW data center.

The result delivers rapid time-to-market, ongoing lease revenue during construction, and local jobs for the community.

A row of large insulated cylindrical tanks with red valve piping in a data center mechanical room.
An unfinished data center room with empty equipment racks, wire cable trays overhead, and ladders and tools scattered around.

Preconstruction Approach

Technical expertise, creative problem-solving, and regulatory know-how

A conversion of this scale depends on understanding the site, anticipating challenges, and coordinating every detail. Careful planning and hands-on trade management kept the renovation moving smoothly from phase to phase.

Early modeling aided planning for complex project steps, including generator placement.

A yellow industrial generator with visible engine components sits on a rooftop platform, framed by downtown skyscrapers.
Four construction workers in hard hats and safety vests watch a large generator being lifted by crane past a glass office building.
A crane lowers a large gray enclosure onto a rooftop generator installation, with the Minneapolis skyline in the background.

Impact

Fast to market, light on the neighborhood

By working within the central business district and building on existing infrastructure, we avoided the need for new zoning and moved utilities into place more quickly. The result is a smoother path to completion with less disruption to the surrounding neighborhood. Ultimately, the facility is designed so most people passing through downtown would never know a data center is there.

An industrial mechanical room with color-coded pipes (yellow, blue, green, white) running along a catwalk.

Built for Performance

Updating data infrastructure for greater efficiency and future demands

Core42 is built with advanced power and cooling systems that keep it reliable under heavy demand. Cerebras AI technology powers the facility’s high-performance capabilities, while 24MW of capacity provides the flexibility and resilience to support what’s next.

Rows of large electrical switchgear cabinets in a data center under construction, with wrapped equipment and cable trays overhead.